Itabara Bridge

Construction of 303.32 M long 2 lane (7x42.68m span) Pre-stressed Concrete Girder Bridge (Itabara Bridge) over Dhaleswari river at 18th km of Kholamora-Hazratpur-Hemeayetpur road under division Dhaka.

Description of Works

Tender Bridge Length = 303.32m

Total Span = 7 Nos.

Span length  = 42.68 m

Tender Amount= Tk. 18,60,66,163/-

Final Bill Amount= Tk.  20,18,88,611.47

Total pilling work = 118 Nos.

1000 mm dia = 78 Nos.

Length  = 30m

750 mm dia = 40 Nos.

Length = 30 m